Recent work
Jobs around Christchurch.
These are demo photos. On your own website, this gallery shows photos of your real jobs.
New three-bedroom homeLincoln · Plan-based, 165 m² Second-storey extensionCashmere · Two bedrooms and a bathroom added Covered outdoor roomBurnside · Roofed deck with a fireplace Granny flatHalswell · 62 m², two bedrooms Renovation planningSt Albans · Plans and consent for an open-plan kitchen Earthquake repairAvonhead · Foundation relevel and relining
What we build
Extensions, renovations, granny flats and new homes.
Extensions
Extra bedrooms, bigger living areas and second storeys, designed to look like they were always there.
Needs a building consent: we handle it
Renovations
Kitchens, bathrooms and open-plan living, including structural changes and council sign-off.
We check if walls are structural first
Granny flats
Small standalone homes up to 70 m², built under the new consent exemption.
No consent up to 70 m², with conditions
New homes
Architect-designed and plan-based homes, from slab to keys, with one person managing it all.
Fixed-price contract and progress payments
Decks and outdoor rooms
Decks, pergolas, carports and covered outdoor living areas.
Carports up to 40 m² need no consent
Repairs and recladding
Weathertightness repairs, recladding and earthquake repairs, done properly.
Most like-for-like repairs need no consent
Consents, explained
Does my build need a building consent?
Some building work doesn't need one. These are the government's rules in plain English. We check your project at the site visit and handle the consent if it needs one.
- Granny flat
No consent: Up to 70 m², single storey, standalone
Must be built by licensed professionals, with a PIM from council first and paperwork after. New from January 2026.
- Carport
No consent: Up to 40 m² on the ground
It still has to meet the Building Code.
- Veranda or porch
No consent: Up to 30 m² on the ground floor
Covered decks over a 1.5 m drop are different.
- Shed or sleepout
No consent: Up to 30 m², single storey, lightweight materials
Over 10 m² it must be built or supervised by a Licensed Building Practitioner.
- Repairs
No consent: Replacing like for like in the same spot
Not if what failed was installed less than 15 years ago.
- Extensions and new homes
No consent: Always need a consent
We prepare the drawings and lodge it for you.
All work still has to meet the Building Code, and the district plan can still apply. This is a guide, not legal advice.
How it works
You'll always know what happens next.
- 01
Tell us about the project
Use the form or call. Plans, sketches or photos all help.
- 02
We reply within one working day
Every enquiry gets an answer, even if it's not a job for us.
- 03
Free site visit and written quote
We talk through options, then send a fixed-price quote and a written contract.
- 04
One person runs your build
You get weekly updates and a straight answer when you ask.
Safe to hire
Licensed, insured and guaranteed in writing.
Licensed Building Practitioner
LBP number BP 000000. Check it yourself on the government's public register.
Written contract
Every job over $30,000 gets a written contract and the official checklist, as the Building Act requires.
Written guarantee
Every build comes with our workmanship guarantee, plus the Building Act's 12-month defect repair period.
Insured
Contract works and $2 million public liability insurance, so your project is covered.
Membership badges go here, such as Master Builders or Certified Builders, with their guarantee.
Reviews
What customers say
Google reviews go here. A real customer's site shows their own reviews, with a link to leave one.
Where we work
Is your suburb on the list?
We build across Christchurch, Selwyn and Waimakariri.
- Addington
- Avonhead
- Beckenham
- Bishopdale
- Burnside
- Cashmere
- Fendalton
- Halswell
- Hornby
- Ilam
- Linwood
- Merivale
- Papanui
- Parklands
- Redcliffs
- Riccarton
- St Albans
- Shirley
- Spreydon
- Sumner
- Sydenham
- Wigram
- Rolleston
- Lincoln
- Prebbleton
- Rangiora
- Kaiapoi
- West Melton
- Darfield
- Woodend
Pricing
How pricing works
- The site visit and quote are free.
- You get a fixed price in writing. It only changes if you change the job.
- Payments are made in stages as the build progresses.
- We don't publish prices, because every build is different. You'll have a real number before you commit.
Free quote
Tell us what you're planning.
We reply to every enquiry within one working day. Then we book a free site visit and send a written quote.
- Call
- 03 000 0000
- Hours
- Mon to Fri, 7am to 5pm
Quick answers
Do you charge for quotes?
No. The site visit and written quote are free, with no obligation.
Can you sort the consent?
Yes. We work with designers and engineers, and lodge the consent with council for you.
How long does an extension take?
Most take 10 to 16 weeks on site once consent is issued. You'll get a schedule with the quote.
Do you build granny flats under the new exemption?
Yes. We're licensed to build them, and we handle the council's PIM and the paperwork at the end.